Highvale Mine Firewater Replacement

The underground firewater piping system at TransAlta’s Highvale Mine, south of Lake Wabamun, Alberta, had corroded and required replacement. ONEC was contracted to engineer and replace the underground system with new HDPE piping, hydrants, and post indicator valves.  This project had road crossings and over 100 piping and electrical crossings to be managed by our construction teams.

  • Category: Mining
  • Client: TransAlta
  • Location: Wabamun, Alberta
  • Project Date: 2008
  • Scope: Full EPC, Project Management, Civil Engineering, Structural Engineering, Mechanical Engineering, Piping Design, and Construction and Startup.